Tier 1: ground truth. Tier 2: standards-aligned models. Tier 3: stated assumptions. Tier 0: intent. The badge appears in-line with the claim — not in a footnote you have to hunt for.
| Tier | ID | Claim | Source | As of | |
|---|---|---|---|---|---|
| T1 | REG-001 | 13,010 ha corridor area · cadastral cross-check. | Cadastral cross-check | FEB 2026 | |
| T1 | REG-002 | 7,350 ha agricultural belt — bound by perpetual easement. | Plan + covenant register | FEB 2026 | |
| T1 | HYD-001 | Wadi Barada baseline flow · 9 monitoring stations, 36-month record. | On-site instrumentation | JAN 2026 | |
| T2 | HYD-002 | Sub-basin water budget — 30-year horizon · MIKE-SHE method. | Standards-aligned model | FEB 2026 | |
| T1 | HER-001 | Roman Temple, S07 — heritage register clearance. | Heritage register | FEB 2026 | |
| T1 | HER-002 | 12 archaeological sites — survey complete, ICOMOS-aligned. | Field archaeology | JAN 2026 | |
| T2 | HER-003 | UNESCO buffer zone — Damascus Old City visual axis preserved. | ICOMOS guidance | JAN 2026 | |
| T1 | AGR-001 | Existing tenure — 4,210 households across 14 villages. | Tenure registry | FEB 2026 | |
| T2 | AGR-002 | Belt productivity model — olive, stone-fruit, grain. | Cooperative + corridor-comparable | FEB 2026 | |
| T2 | FIN-001 | Phase A capital · $4.2B · IFI-comparable infrastructure stack. | Capital model · IFI methods | FEB 2026 | |
| T2 | FIN-002 | Programmatic DFI co-investment pathway — healthcare, education, energy. | DFI engagement, indicative | FEB 2026 | |
| T3 | FIN-003 | Sequenced phasing trigger — Phase B opens at occupancy ≥ 70% Phase A. | Stated assumption | FEB 2026 | |
| T1 | MAS-001 | 28 km BRT spine · Yafour West → Qatana · 14 stations. | Master plan + transit study | FEB 2026 | |
| T2 | MAS-002 | Density target ~360 p/ha at T6 core · corridor-comparable to Damascus historic. | Density study, comparable | FEB 2026 | |
| T3 | MAS-003 | Maturity at 2050 · 1,000,000 residents · stated programme. | Programme target | FEB 2026 |
Ten spatial gates, seven platform gates. Each gate is an open question with an owner and a clearance protocol. Anything dependent on an open gate is labelled accordingly.
| VG-SP-01 | Cadastre & land title |
| VG-SP-02 | Heritage assets inventory |
| VG-SP-03 | Military exclusion zones |
| VG-SP-04 | Hydrology & flood risk |
| VG-SP-05 | Traffic counts & O-D survey |
| VG-SP-06 | Utility capacity |
| VG-SP-07 | Geotechnical survey |
| VG-SP-08 | Environmental baseline |
| VG-SP-09 | Demographic ground-truth |
| VG-SP-10 | Post-Sharaa regulatory framework |
| VG-PLAT-01 | Spatial data licensing |
| VG-PLAT-02 | Esri ArcGIS Urban seat count |
| VG-PLAT-03 | Autodesk AEC Collection licence |
| VG-PLAT-04 | VCS VC Suite 2026 availability |
| VG-PLAT-05 ⚠ | Sanctions screening — ALL vendors (critical) |
| VG-PLAT-06 | Sovereign hosting region |
| VG-PLAT-07 | PostGIS open-source fallback |
An Israeli airdrop event in Yafour Zone-2 (July 2025) is documented as hard-evidence security input. The incident is reflected in site-security posture, insurance assumptions, and the 500 m military exclusion buffer. It does not move the planning envelope — but it is named.
Title trace from current registry back to the Mandate cadastral baseline.
Sanctions screening of all parties in the title chain, including ultimate beneficial owners.
Mortgages, easements, leases, disputes — all encumbrances surfaced and either cleared or disclosed.
Post-conflict property-law counsel review — pre-conflict tenure, displaced-owner claims, restitution exposure.
Field cadastral verification — pegs, boundaries, neighbour confirmation — before any binding commitment.
14 canonical values are displayed verbatim across every artefact — no rounding, no rephrasing, no audience-dependent variants.
Reasoning patterns explicitly prohibited — these collapses appear plausible and are not.
Blocks all Western vendor onboarding until resolved. Critical-path dependency.
Gateway · Command Core · Dual — three candidate identity frames. One must be chosen for the instrument to lock.
Shortlist defined; appointment gated on sanctions clearance and sovereign sign-off.
Each of the 17 verification gates needs a named owner with clearance authority before that gate moves from open to under-clearance.
v1.0 artefact register — what counts as a complete master-plan output at each phase gate.
—
—
—
—